Commission feedback deadline: Revision of the Network Code on Requirements for Grid Connection of Generators
Why it matters
Revision of grid-connection rules will shape EU renewable energy and battery storage deployment rates, directly affecting the pace and cost of decarbonisation and energy independence from fossil fuel imports.
What to watch
- No announcement lands on this date — the feedback window simply closes. Next public step: the Commission summarises the feedback received and moves the file towards adoption.
- Process stage to verify: isc workflow.
- Commission summary: The network codes on requirements for grid connection of generators and on demand connection are binding rules governing connection requirements to the electricity grid. They are crucial for ensuring the safety of system operation and the efficiency of the EU power grid. This initiative will update the network code and future-proof it to further support the EU power grid, embracing emerging developments such as increased deployment of renewable energy, e-mobility and battery storage.
Sources
- European Commission Have your say: Revision of the Network Code on Requirements for Grid Connection of Generators
- European Commission Have your say
Open in the calendar
Open this event in the live GeoVeu calendar, where it sits alongside everything else scheduled around it.